Permit and Inspection Fees
City Code of the City of Washington, North Carolina
Chapter 4, Article 1, Section 4-7
effective July 1, 2000
(2) Commercial Fee Schedule
| a. Any work started without a required permit
will be charged the original fee plus a penalty equal to the
original fee (i.e. original fee is $25.00, penalty fee is $25.00,
the total cost will be $50.00). |
| b. New and additions, cost per square foot,
per floor: |
1. Building and insulation permit
2. Electrical permit:
3. Plumbing permit:
4. Heating and/or A/C permit:
5. Minimum permit fee:
6. Insulation permit: |
$ 0.12
$ 0.05
$ 0.05
$ 0.05
$25.00
$25.00 |
c. Accessory buildings, porches, decks, etc.,
cost per square foot, per floor: |
|
1. Building and insulation permit:
2. Electrical permit:
3. Plumbing permit:
4. Heating and/or A/C permit:
5. Minimum permit fee:
6. Insulation permit: |
$ 0.07
$ 0.03
$ 0.03
$ 0.03
$25.00
$25.00 |
| d. Re-shingle or shingle permit |
$25.00 |
e. Moving of buildings |
$100.00 |
| f. Electrical inspection for lights |
$25.00 |
| g. Siding installation |
$25.00 |
| h. Demolition of buildings |
$100.00 |
| i. Repairs, change of service, sewer |
|
1. $1.00 to $5,000 construction
cost
2. Each additional $1,000 construction
cost (per thousand) |
$30.00
$ 2.00 |
| j. Reinspection fee |
$25.00 |