Electric Rates & Fees

Electric Rates

RESIDENTIAL
 
RT1 - Residential Service (inside City) Single Phase $8.69 Customer Charge
$0.117032/kWh
RT3 - Residential Service (inside City) Three Phase $18.15 Customer Charge
$0.117032/kWh
RS1 - Residential Service (outside City) Single Phase $9.16 Customer Charge
$0.123192/kWh
RST3 - Residential Service (outside City) Three Phase $19.12 Customer Charge
$0.123192/kWh
RGF1 - Resident Generating Facilities Service (Solar) $50.00 Customer Charge
RGN - Residential Service Generation Option $32.29 Customer Charge
$0.127076/kWh
COMMERCIAL  
RC1 - Church Service Single Phase $10.36 Customer Charge
$0.129399/kWh
RC3 - Church Service Three Phase $21.62 Customer Charge
$0.129399/kWh
GF1 - Commercial Generating Facilities Service (Solar) $225.00 Customer Charge
REF-1 - Renewable Energy Facilities Credit Rider Number 1 $0.0630/kWh credit for all kWh delivered to WEU
*Not offered for new services
GS1 I GT1 - Small General Service Single Phase (less than 50 kW) $18.34 Customer Charge
$0.133946/kWh - 1st 2,000 kWh
$0.120900/kWh - next 6,000 kWh
$0.100031/kWh - over 8,000 kWh
$3.92/kW - all over 30 kW
GS3 I GT3 - Small General Service Three Phase (less than 50 kW) $29.58 Customer Charge
$0.133946/kWh - 1st 2,000 kWh
$0.120900/kWh - next 6,000 kWh
$0.100031/kWh - over 8,000 kWh
$3.92/kW - all over 30 kW
RG1/RG3 - Recreational General Service $0.140719/kWh - 1st 2,000 kWh
$0.119907/kWh - next 6,000 kWh
$0.099038/kWh - over 8,000 kWh
$3.92/kW - all over 30 kW
MG1 I MT1 - Medium General Service Single Phase (greater than 50 kW; less than 150 kW)
$19.79 Customer Charge
$0.131395/kWh - 1st 5,000 kWh
$0.118091/kWh - next 25,000 kWh
$0.102573/kWh - over 30,000 kWh
$4.16/kW - all over 30 kW
MG3 I MT3 - Medium General Service Three Phase (greater than 50 kW; less than 150 kW)
$31.91 Customer Charge
$0.131395/kWh - 1st 5,000 kWh
$0.118091/kWh - next 25,000 kWh
$0.102573/kWh - over 30,000 kWh
$4.16/kW - all over 30 kW
GS2 I GT2 - Large General Service (greater than 150 kW; less than 1,000 kW) $2,253.23 - 1st 150/kW of billing
$14.01/kW - for all additional kW of billing
$0.27/rkVA - for all rkVA
$0.074907/kWh - for all kWh
TD1 - General Service Time-of-Use Single Phase (greater than 50 kW; less than 1,000 kW)
$19.79 Customer Charge
$0.072816/kWh
$15.67/kW - for on peak demand
$3.78/kW - monthly peak demand
TD3 - General Service Time-of-Use Three Phase (greater than 50 kW; less than 1,000 kW)
$31.91 Customer Charge
$0.072816/kWh
$15.67/kW - for on peak demand
$3.78/kW - monthly peak demand
IND - Industrial Service (greater than 1,000 kW) $0.073698/kWh
$13.36/kW
$0.27/rkVA
CD1 - General Service Coordinated Demand Control (greater than 50 kW; less than 1,000 kW) $95.70 Customer Charge
$0.066539/kWh
$20.49/kW - coincident peak demand
$3.78/kW - monthly peak demand
$189.00 minimum demand up to 50 kW
CD2 - Industrial Service Coordinated Demand Control (greater than 1,000 kW) $0.063673/kWh
$20.20/kW - coincident peak demand
$3.73/kW - monthly peak demand
$186.50 minimum demand up to 50 kW
$0.27/rkVA

LMS - 
Load Management Service

Single Phase $12.59 Customer Charge
Three Phase $24.52 Customer Charge
$0.107963/kWh
$2.13/kW   all over 30 kW

SL1 -
City Street Lights

$0.071641/kWh

Outdoor Lighting

Rate Price kWh Description
A02 $21.81 70 150-watt High Power Sodium
A03 $31.15 150 400 watt Mercury on new pole
A04 $32.56 150 400 watt Mercury Flood on new pole
A05 $28.76 105 250 watt Sodium Flood on new pole
A06 $62.41 360 1,000 watt Metal Halide Flood on new pole
A07 $47.90 360 1,000 watt Metal Halide Flood on existing pole
A08 $30.69 --- Extra pole charge
A09 $26.46 150 400 watt Mercury Flood on existing pole
A10 $27.19 105 250 watt Sodium Flood on existing pole
A11 $28.76 105 250 High Power Sodium
A12 $9.92   35-watt Sodium Vapor
A14 $19.36 70 150-watt HP Sodium
A16 $12.91 70 45-watt LED
A17 $19.18   96-watt LED Flood Light
A18 $19.18   110-watt LED
A19 $36.78   297-watt LED Flood Light

*Using old fixture rates until they are changed out to LED's.*

Electric Meter Testing/Reread

Electric Meter Testing $50.00
Electric Meter Reread $20.00
*If the meter is found to be in error, the fee will be refunded and the electric usage and billing adjusted per adjustment policy and City ordinance.*


Service Fees

New/Change of Service Connection - Water $25.00
New/Change of Service Connection - Electric $25.00 + tax

Tampering

  • A $400.00 fee shall be charged for the City's cost in investigating customers who energize their electric service without permission of the City. Service may be discontinued if this fee is not paid.
  • A $50.00 fee for verification of the accuracy of the meter after tampering has been established.
  • The amount of estimated lost revenue.
  • Meter repair charges if the meter is damaged.

Used Poles
We no longer sell used poles.